Main tasks
-
Development of the efficient technology of bitumen heating
-
Development of the energy saving program
Decision
Asphalt concrete mixing plant, Tikhoretsk. Inspection of the actual condition of reservoirs of the bitumen storage and preparation shop was done. The system of electric heating via cut-in reservoir elements (flame tubes) was developed and implemented.
Asphalt concrete mixing plant, Ust-Labinsk. Energy audit of the sources and consumers of the plant’s energy was done, recommendations on energy costs reduction were suggested. The bitumen storage shop was designed. Works on automation of the bitumen facility were carried out.
Results
-
Cut-in heating element
-
Energy-saving program
-
Production automation