A draft of the main technical solutions for the terminal for storing 95 thousand tons of viscous petroleum products has been developed
ПодробнееAn energy inspection of the "summer" and "winter" bitumen warehouse was performed
ПодробнееThe technical equipment section of the bitumen warehouse for the mastic and primer shop has been developed
ПодробнееWorking documentation has been developed for the bitumen supply warehouse for the ABZ
ПодробнееThe executive documentation for the consumable warehouse of the PBV installation has been prepared
ПодробнееA technological project for a 120 t/day mobile bitumen terminal has been developed
ПодробнееThe design and working documentation for the construction of a bitumen storage depot has been prepared.
ПодробнееThe working documentation for the construction of the bitumen terminal has been developed
Подробнее