The company's projects are Energy Efficient Bitumen Technologies

Our works

DSK-Crimea LLC

An oil melting pot of 700 L mastic for seams was made

Подробнее
Power of Siberia JSC

A draft of the main technical solutions for the terminal for storing 95 thousand tons of viscous petroleum products has been developed

Подробнее
Techno Sonus LLC

An energy inspection of the "summer" and "winter" bitumen warehouse was performed

Подробнее
Projectinnovation LLC

The technical equipment section of the bitumen warehouse for the mastic and primer shop has been developed

Подробнее
JSC GORDORMOSTSTROY

Working documentation has been developed for the bitumen supply warehouse for the ABZ

Подробнее
Bitumen Emulsions LLC

The executive documentation for the consumable warehouse of the PBV installation has been prepared

Подробнее
SIBCOALEVRO LLC

A technological project for a 120 t/day mobile bitumen terminal has been developed

Подробнее
JSC Trust Uraltranspetsstroy

The design and working documentation for the construction of a bitumen storage depot has been prepared.

Подробнее
Rustam LLC

The working documentation for the construction of the bitumen terminal has been developed

Подробнее