The "EBT” ("BitumTech") company reconstructs bitumen workshops for enterprises whose activities are related to storage, preparation and use of this material. If you would like to order the service, feel free to contact the company's specialists by phone or e-mail and you will receive a full consultation with preliminary calculations of the work costs.
Any enterprise needs renovation. If we are talking about a complete modernization and technical re-equipment of the enterprise, then the process is usually called reconstruction. Equipment wear and tear, the emergence of modern technologies that make the processes of storing, preparing and using bitumen less costly economically - all this leads to the necessity and inevitability of upgrading the enterprise.
Very often the reconstruction of bitumen workshop is carried out in stages in order to minimize interference in production processes. The reconstruction of the shop is carried out by sections with the replacement of equipment in strict order. That is why zonal reconstruction or nodal technology is used.
Reconstruction of any shop should begin with planning documentation. Prior to its execution, it is necessary to fully inspect the territory of the enterprise, conduct an energy survey, so that in the future the operation of the bitumen shop would be more efficient at the lowest financial cost.
When reconstructing the bitumen plant, it is necessary to provide for a number of factors that will determine the efficiency and convenience of storage, dewatering, heating and further preparation of bitumen for use.
A correctly selected process scheme will optimize plant costs while increasing efficiency.
There are many reasons for this:
Reconstruction, planned and executed at a professional level, will allow the enterprise to achieve high efficiency and reliability at each stage of work, reduce the risk of equipment failure, and therefore extend the service life of the equipment.
Specialists of “EBT” ("BitumTech") LLC provide assistance and perform “turnkey” works on reconstruction of bitumen shops. The list of works performed includes:
1. Development of a technological project for reconstruction of bitumen storage and preparation shops, preparation of bitumen-containing products, including:
- development of technological and hydraulic schemes of bitumen shops and bases;
- energy calculations of process equipment, communication lines, complex systems and individual processes of bitumen heating and transportation;
- development of recommendations on the selection of heating elements and their individual parameters;
- design of master plans for the placement of bitumen storage and heating equipment complex;
- development of technological maps of the production process and recommendations for optimizing existing technology.
2. Design and manufacture of standard and unique equipment for storage and heating of bitumen, including:
- design and manufacture of horizontal and vertical tanks for storage and primary heating of bitumen - above-ground bitumen storage facilities;
- design and manufacture of tanks for intensive heating of binder - intensive heating tanks;
- design and manufacture of equipment for storage of polymer-bitumen binder with mixing devices;
- design and manufacture of equipment for melting bitumen packaged in medium-tonnage containers - bitumen melters;
- design and manufacture of devices for localization of bitumen heating in large volume storage tanks - KUPOL™ internal heating systems;
- design and manufacture of electric liquid coolant heaters.
3. Design of bitumen heating systems and manufacturing of heating elements, including:
- calculation of the parameters of heating elements required for implementation (surface area of oil registers, thermal power of electric heating elements, required surface power, etc.);
- development of heating element placement schemes to ensure maximum heat transfer;
- draft design, development of metal construction projects for bitumen heating systems in vertical (above-ground), horizontal and pit bitumen storage facilities;
- manufacturing and installation of heating units from electric bitumen heaters (block heating elements) and oil registers.