Проект Комбинат дорожных и строительных материалов - компания Битумные Технологии

Road and Construction Materials Complex

10.05.2018

Main tasks

  • Study of bitumen storage mode

  • Optimization of the technological process

Decision

Study of thermal fields in horizontal above-ground tanks. Study of thermal fields in the 1,000 m3 pit-type storage facility. It was established that long-term operation of the storage facility with low efficiency of the plant causes bitumen overheating in the storage facility thus increasing energy costs for its operation and exerting negative impact on the binder’s quality. More details on the study results may be found in the Articles section. Analysis of energy consumers of the oil heating system was done with development of recommendations on the facility upgrade.

Results

  • Recommendations on energy costs reduction

  • Bitumen thermal fields in the vertical steel storage tank RVS 1000

Start a project

By clicking the submit button you consent to the processing of personal data