Проект ОАО Ейское ДСУ №2 - компания Битумные Технологии

OAO Yeysk Road Construction Administration No.2

10.05.2018

Main tasks

  • Reduction of energy costs for bitumen preparation

Decision

Asphalt-concrete mixing plant No.1, village of Aleksandrovka. Survey of the actual condition of the bitumen facility was carried out, measurement of thermal fields and calculation of actual energy costs for the shop operation were done. Recommendations on minimization of energy costs at the facility were developed. The system of heating and maintenance of temperature for the reservoir for preparation of liquid bitumen cutback was worked out. Thermal protection of the process equipment was done

Results

  • Recommendations on reduction of energy costs