Main tasks
-
Estimation of technical condition of the storage facility’s processing equipment
-
Development of suggestions on the process optimization with the view to reduce energy consumption
Decision
The bitumen storage facility is part of the asphalt-concrete plant and it includes: the storage tank farm and the intensive heating shop. Due to significant technological inferiority of the equipment the manufacturing process is marked by low efficiency and high energy consumption. In the course of preliminary (technological) inspection the principal sources of energy saving and the means of efficiency improvement were specified.
Results
-
Recommendations on reduction of energy consumption