Inert Empire LLC

20.12.2025

Main tasks

  • To develop a technology for receiving, storing and shipping bitumen

  • Calculate the need for basic resources

  • Design the general plan of the terminal

  • To develop installation and technological schemes

Decision

The project "Basic Technical Solutions" (OTP) provides for a variant study of the facility: "Bitumen warehouse located at 252 Severnaya Promzona, Armavir, cadastral number of the site 23:38:0102001:640." The main technical solutions have been developed on the basis of variant design. The following sections are provided for the variant study of the bitumen warehouse design: - Railway transport unloading area. - The unloading area of vehicles. - Bitumen storage area. - The heating area of the coolant. - The site of polymer bitumen binder preparation. - The bitumen emulsion preparation site. - Bitumen packing area. - Vehicle loading area. - The location of fire-fighting water supplies. - The ABC building with a control room and a laboratory.

Results

  • Energy calculations are performed

  • The list of the main equipment is defined

  • The technology of work production has been developed

  • The terminal's master plan has been developed