Main tasks

  • Development of the energy-efficient technology for reception, storage and heating of bitumen

  • Study of alternative engineering solutions

  • Development of the materials and equipment specification

Decision

The contract for technological design provides for preliminary technical solutions ensuring the following: option 1 – technical upgrade of the oil delivery terminal to the roadside terminal for reception and buffer storage of binders; option 2 - technical upgrade of the oil delivery terminal to the railway terminal for both buffer storage of bitumen and year-round transshipment. For both options capital and operating costs were calculated, and selection and arrangement of production equipment were done. The final solution implied option No 2: reception of bitumen at highways and railroads, buffer storage and transshipment to trucks. To achieve the required key performance indicators two operation technologies for different areas were accepted: for the area of bitumen unloading from railway transport – the technology of accelerated heating by Igla type plants, for the tank storage facilities – cost-saving and efficient heating by means of the Kupol internal heating equipment.

Results

  • Engineering design of the railway bitumen terminal was worked out

  • Aggregated estimation of capital costs was done

  • Specification of equipment and materials was developed

  • Operating costs were calculated (including the costs of repair and damage control)

Suitable equipment and services

Bitumen heating system "Kupol"

More

Design of bitumen terminals, shops, warehouses and bases on a turnkey basis

More

Reconstruction of bitumen workshops of enterprises

More

Start a project

By clicking the submit button you consent to the processing of personal data