AO Pavlovsk Nerud

06.04.2022

Main tasks

  • Development of the energy-efficient technology for reception, storage and heating of bitumen

  • Study of alternative engineering solutions

  • Development of the materials and equipment specification

Decision

The contract for technological design provides for preliminary technical solutions ensuring the following: option 1 – technical upgrade of the oil delivery terminal to the roadside terminal for reception and buffer storage of binders; option 2 - technical upgrade of the oil delivery terminal to the railway terminal for both buffer storage of bitumen and year-round transshipment. For both options capital and operating costs were calculated, and selection and arrangement of production equipment were done. The final solution implied option No 2: reception of bitumen at highways and railroads, buffer storage and transshipment to trucks. To achieve the required key performance indicators two operation technologies for different areas were accepted: for the area of bitumen unloading from railway transport – the technology of accelerated heating by Igla type plants, for the tank storage facilities – cost-saving and efficient heating by means of the Kupol internal heating equipment.

Results

  • Engineering design of the railway bitumen terminal was worked out

  • Aggregated estimation of capital costs was done

  • Specification of equipment and materials was developed

  • Operating costs were calculated (including the costs of repair and damage control)

Suitable equipment and services

Bitumen heating system "Kupol"

More

Reconstruction of bitumen workshops of enterprises

More

Design of bitumen shops, warehouses and bases

More

Start a project

By clicking the submit button you consent to the processing of personal data